Auxerre (89) Sainte-Geneviève central park

Phase : APD
Maître d'ouvrage : Ville d'Auxerre
Date de réalisation : 2008
Surface du projet : 11 500 m²
Montant des travaux : 2 000 000 € H.T.

The layout presents two sinuous paths that cross the park in its length. This attitude refers to the springs that once flowed through the site and also allows for the presentation of forms in opposition to the general organization of the neighborhood. Straight paths connect to these wide paths to allow direct links with the main building lobbies and the organization of the parking lots.

Overall surface area: 24,000 m² (24,000 sq. ft.)

Surface of the park: 11,500 m²

ANRU project