Lumes (08) Activity zone

Phase : Studies
Maître d'ouvrage : Conseil général des Ardennes
Date de réalisation : 2005

On this steeply sloping grassland area, the purpose of this design is to minimize the impact of the project on the site by matching the building to the topography of the site.