Nogent (52) Historical centre
Phase :
Achievement
Maître d'ouvrage :
Ville de Nogent
Date de réalisation :
2018
Surface du projet :
18 520 m²
Montant des travaux :
3 819 711 € H.T.
Lien :
Ville de Nogent
In Nogent-en-Bassigny, public space’s template is clear regarding its uses: the pedestrian needs an obvious room, and public space has to be redrawn to dialog with its facades.
Grounds’ materials create a permanent relation between public space and built strips.