Longueville-sur-Aube, Charny le Bachot et Etrelles-sur-Aube (10) Wind power : Landscape section of the impact study - 10 wind turbines : Building permit granted
Phase :
Studies
Maître d'ouvrage :
Jaquel & Chatillon
Date de réalisation :
2009
Located in Champagne Crayeuse and close to the confluence of the Aube and the Seine, this wind farm maintains a close relationship with the ridge lines of the landscape of the chalk plain.